What the build process looks like.
Building with the NCS team follows six steps, from the first conversation through completion. The same team handles design, permitting, vendors, and the site, and you follow the work in Buildertrend.
The six steps
Every project starts with a conversation. The NCS team wants to know your goals, how you will use the home, your timeline, and your budget. If you already own the lot, we look at it together.
Design comes next, with your architect or ours, shaped around the realities of the site: setbacks, grade, septic, and the view.
The budget is open book. Real numbers, not vague estimates, are matched to the scope as the design grows.
When the project is ready to build, selections are generally agreed in the design meetings by the end of planning. Permits are secured, vendors are lined up, and the schedule is set before ground breaks. Selections are then confirmed at set stopping points during the build.
During construction, the NCS team runs the site day to day. You follow along in Buildertrend with photos, budget, and schedule in one place.
At completion we walk the home together, finish the punch list, and stay close under a lifetime craftsmanship warranty.
What the NCS team handles
Owners who are new to custom building often want to know how much of the process they have to run themselves. With the NCS team, you do not have to coordinate the county, the trades, and the drawings on your own.
Drafting and design can be done in house, with numbers attached as the plan takes shape, or the NCS team can build alongside your architect and interior designer. Either way, the drawing and the number move together.
The team handles shoreland permitting and compliance with the county, lines up trusted vendors, and staffs the job with in-house carpenters, project managers, and a quality control team. Labor and trades are part of that same process, not a separate project you have to manage.

How long it usually takes
Once a contract or concept is approved, ramp-up is typically 60 to 90 days for new homes, and as little as 30 days for remodels and accessory buildings. Design and budget can keep moving during that time.
Large or custom homes generally take 10 to 16 months. Small to medium homes take 6 to 10 months. Remodels take 3 to 6 months. Accessory buildings take 1 to 6 months. Weather and materials can change this, and the NCS team sets a schedule with you.
Questions owners ask,on this topic.
Or call (715) 825-4870.
iI am new to building. Where do we start?
Start with a conversation, or with Know Before You Build if you want a ballpark first. The NCS team will walk you through the six steps and what applies to your lot.
iiDo I have to bring my own architect?
No. The NCS team offers in-house drafting and design, and we also build alongside your architect or designer if you already have one.
iiiDo you handle permits and vendors?
Yes. The NCS team takes shoreland permitting through the county, lines up vendors, and runs the site. You are not asked to coordinate those pieces yourself.
ivHow will I know where the project stands?
During construction you follow photos, budget, and schedule in Buildertrend. The NCS team also meets with you at major milestones.