Permitting and compliance
Building on the water.
On a lake lot, the rules decide what can be built before anyone draws a kitchen. We handle permitting from start to finish, with the county and the state.
01What the county looks at
Shoreland zoning,in plain words.
General guidance only. Rules vary by county, town, and lot, and every county has its own process. Sources: Wis. Stat. 59.692 and Wis. Admin. Code NR 115.05.
- iThe shoreland zoneLand within 1,000 feet of a lake falls under shoreland zoning, with rules set by the state and adopted by each county.
- iiSetbacksHomes sit back from the water, commonly 75 feet from the ordinary high-water mark, plus side, road, and wetland setbacks.
- iiiSetback averagingIf the homes on both neighboring lots sit closer than 75 feet, a new home may be allowed at the average of their setbacks, but no closer than 35 feet. The neighbors must be on adjacent lots and within 250 feet.
- ivExisting homes in the setbackAn older home at least 35 feet from the water can often add on sideways, up to 200 square feet in total over the life of the structure, with a permit and a mitigation plan. No part of the addition can be closer to the water than the house is now.
- vImpervious surfaceRoofs, drives, and patios near the water are capped. Going over can mean a permit and a mitigation plan.
- viVegetation and viewsRules protect a natural buffer along the shore, with limits on clearing and a path to the water.
- viiNonconforming structuresOlder homes too close to the water have their own rules for repair, additions, and rebuilding.
- viiiSeptic, well, and erosionSanitary permits, well placement, and erosion control plans, before the first shovel.
02How we handle it
Permitting built in,not bolted on.
- iSite and feasibility reviewWe look at the lot, the zoning, and the limits early.
- iiDesign alignmentPlans drawn with the rules in mind from the start.
- iiiPre-submission coordinationVariances or special approvals worked through ahead of time.
- ivSubmission and reviewApplications, documents, and meetings with the county, handled by us.
- vAdjustments and approvalRevisions made quickly, so the project keeps moving.

·Fewer surprises
Approved beforewe break ground.
03By county
Each countysets its own rules.
Shoreland rules are adopted and enforced county by county. Start with yours.
04Common mistakes
Where projectsget stuck.
- iDesigning before knowing the rulesA plan that cannot be permitted costs time and money.
- iiUnderestimating the shorelineSetbacks and surface limits shape the whole site.
- iiiLeaving septic and well for laterThey decide where the house can go.
- ivAssuming approvals are quickSome take a hearing and a season.